Tel:
Hebei Changtong Steel Structure Co., Ltd.
Hebei Changtong Steel Structure Co., Ltd.

Hebei Changtong Steel Structure Co., Ltd.

20 years of communication tower design and production experience
Provide comprehensive professional consulting services
Has served countless communication carriers

Home ProductsGuyed Wire Tower

3 Leg Supported Steel Mast 120m Guyed Wire Tower

3 Leg Supported Steel Mast 120m Guyed Wire Tower

  • 3 Leg Supported Steel Mast 120m Guyed Wire Tower
3 Leg Supported Steel Mast 120m Guyed Wire Tower
Product Details:
Place of Origin: China
Brand Name: ChangTong
Certification: SGS, ISO2008:9001
Model Number: LXT190409-7
Payment & Shipping Terms:
Minimum Order Quantity: 1 pi
Price: USD1000-1500/Ton
Packaging Details: Container transpor, the general situation of the tower for metal reinforcement bind,Bolts are bagged from professional containers.
Delivery Time: 30-45days
Payment Terms: L/C, T/T, Western Union, MoneyGram
Supply Ability: 20000Ton/year
Contact Now
Detailed Product Description
Material: SteelQ345/Q235 Appearance Treatment: Hot-dip Galvanized/powder Coated/painting
Height: 10m-120m/Customized Design Wind Speed: 36m/s
Connection Structure: Flange Connection/bolts Connection Quantity Of Platform: 1/2/3/4/Customized
Lifetime: More Than 20years Name: Lattice Steel Communication 10m Guyed Wire Tower
High Light:

120m guyed wire tower

,

120m guyed mast tower

,

3 leg guyed wire tower

Guyed tower,

The guyed tower is mainly composed of a slender rod and several layers of cables arranged obliquely along the height. The rod is the main load-bearing structure, and the cables pull the rod in three or four directions to ensure the upright and stability of the rod. The pole body has independent steel tube solid web structure and truss structure composed of steel tube, round steel and angle steel. Multi strand high strength galvanized steel strand is used for the rope.
Product performance characteristics:
1. Convenient installation and fast construction speed;
2. Light components, less land occupation and damage to the load
3. Convenient transportation and maintenance

 

Material
Q345B / Q235B
Galvanized
Hot Dip Glavanization, thickness is>=12um
Avaivable Height
5-80m
Life Time
Minimum 30 years
Wind Pressure
5-180KM/H
Delivery Lead Time
About 20 days after receipt of your deposit
Working & Resting Platform Quantity
1-3 PCS
Antenna Support Quantity
3-6 PCS
Microwave Dish Quantity
3-6 PCS
Feature
Less space, elegant appearance
MOQ
1 Set

3 Leg Supported Steel Mast 120m Guyed Wire Tower 0

Production Process
3 Leg Supported Steel Mast 120m Guyed Wire Tower 1
Testing process
3 Leg Supported Steel Mast 120m Guyed Wire Tower 23 Leg Supported Steel Mast 120m Guyed Wire Tower 3
Relet Product
3 Leg Supported Steel Mast 120m Guyed Wire Tower 4

 

Contact Details
Hebei Changtong Steel Structure Co., Ltd.

Contact Person: Anne Wang

Tel: 13383380238

Send your inquiry directly to us
Other Products
Hebei Changtong Steel Structure Co., Ltd.
Fu Zhao Village,Guang Chuan Town, Jing County, Hengshui City, Hebei Province
Tel:86-0318-5201186
Mobile Site Privacy Policy | China Good Quality Angle Steel Tower Supplier. © 2021 - 2023 anglesteeltower.com. All Rights Reserved.